Ready-built Factory – Long Hau IP

Tay Ninh Province

Project Overview

Property type

Factory for lease

Location

Tay Ninh Province

Industrial Park

Long Hau Industrial Park

Management fee

Included in rental fee

Construction Status

Under construction

Year of construction

2026

Total Area

~56,000 m²

Building Area

-

Deposit

Negotiable

Minimum Leasing Area

1,000 m²

Licensing support

Available

Tax Incentives

Available

Holiday operation

Available

24-hour operation

Available

Technical Specifications

Wastewater Treatment

Available

Clear Height

8.4 m

Loading Capacity

1.0 – 4 Ton/m²

Power Supply

321 kVA

Fire Fighting

Available

Cooling System

-

Elevator

Available

Freight elevator

4 Ton

Car Parking

Available

Motorcycle Parking

Available

Office Space

-

Solar Power

-

Canopy

-

Insulated Roof

-

Loading Dock

-

Road Width

-

Location

Distance to Airport:

• Tan Son Nhat International Airport (SGN): 95 km
• Can Tho International Airport (VCA): 185 km

Distance to Port:

• Long An International Port: 42 km
• Hiep Phuoc Port: 70 km

Distance to CBD & Travel Route:

• Ho Chi Minh City Center: About 19 km
• Phu My Hung Urban Area: About 12 km

Key Highlights

Long Hau LEED Park is a new-generation multi-storey factory project developed by Long Hau Corporation, located in Long Hau Industrial Park – right at the southern gateway of Ho Chi Minh City.

Unlike traditional factories, the project is positioned as an ESG-standard warehouse and factory complex, designed and developed to LEED Certified standards (an international green building certification) from the very first drawing. It is one of the few projects adjacent to Ho Chi Minh City with carefully planned, fully integrated sustainable infrastructure, giving businesses in global supply chains an outstanding competitive advantage.

3 Core Values That Make the Difference

1. LEED Certified Green Standard – The Key to Global Supply Chains

LEED standards are integrated from the design stage, not added as a patchwork solution after construction.

  • Business advantage: Directly helps businesses meet Scope 3 carbon emission criteria, which are strictly monitored by partners from Europe and North America.
  • Added value: Businesses can pass supplier audits more easily, register for high-tech enterprise certification with ease, and build an ideal workplace that retains talent.

2. “Hybrid” Space Model – Optimized Costs, Flexible Expansion

Instead of leasing multiple separate premises, Long Hau LEED Park offers an “All-in-One” solution.

  • 100% space optimization: Businesses can arrange production areas, warehousing, executive offices or R&D centers within the same leased space.
  • Flexibility: Production can be easily scaled up when needed without relocation or reconstruction costs.

3. Shared Technology Infrastructure – Ready to Operate Immediately

Businesses can start operations right away with modern facilities already provided by the developer:

  • Smart freight elevator system integrated with AGV autonomous robots.
  • Air quality control system meeting ASHRAE standards.
  • AI security camera system with 24/7 monitoring. (All are ready to use, helping businesses minimize initial investment costs.)

Reference Technical Specifications

To meet diverse production and storage needs, Long Hau LEED Park is designed with optimized technical specifications:

Item Details
Total Floor Area ~ 56,000 m²
Flexible Leasing Area 1,000 m² – 2,000 m² – 6,000 m²
Clear Height 8.26 m (Optimized for storage space and ventilation)
Floor Load 1.0 – 4 Ton/m²
Elevator System High-capacity 4-ton freight elevator

Strategic Trade Location

Located in Long Hau Industrial Park, the project enjoys an excellent transport network that optimizes logistics time and costs:

  • 15 minutes to Hiep Phuoc Port.
  • 15 minutes to the Ben Luc – Long Thanh Expressway.
  • 30 minutes to Cat Lai Port.

Suitable Tenants

Long Hau LEED Park is the perfect choice for SMEs and mid-sized FDI enterprises, especially in the following sectors:

  • Precision technology and electronic components.
  • Medical device manufacturing and assembly.
  • Precision engineering.
  • Logistics services and storage of high-value goods.

Project Timeline

  • March 2026: Official groundbreaking.
  • October 2026: Completion of fire safety (PCCC) acceptance.
  • November 2026: Handover of space to tenants.

Lead the green manufacturing trend with Long Hau LEED Park. Don’t miss the chance to reserve space at one of the most modern factory complexes in South Saigon.

Contact us now for a detailed quotation and advice on the most suitable space solution for your business!

Make an Inquiry

How can we help? Our team will get back to you soon.

1
Step 1
2
Step 2

Please enter the following information

Please enter the following information