Tram Vang Industrial Zone

Tay Ninh Province

Project Overview

Property type

Industrial Park

Location

Go Dau District, Tay Ninh Province

Industrial Park

Tram Vang Industrial Park

Developer

0

Target Industries

Mechanical engineering, Electronics, Consumer goods...

Major Tenant Companies

Richy JSC, Jinkel, Lotus Textile

Scale

479 ha

Industrial Land

375 ha

Land Use Term

-

Regional Minimum Wage

Zone II

Tax Incentives

Tax exemption for the first 2 years

Technical Specifications

Supply Voltage

22 kV

Water Supply

7,000 m³ / day

Wastewater Treatment

5,600 m³ / day

Location

Distance to Airports:

  • Tan Son Nhat International Airport (SGN): 53 km
  • Can Tho International Airport (VCA): 189 km
  • Long Thanh International Airport (LTH): 95 km

Distance to Ports:

  • Cat Lai Port: 71 km
  • Hiep Phuoc Port: 75 km

Distance to City Centres & Routes:

  • Ho Chi Minh City: About 59 km via National Highway 22
  • Can Tho City: About 179 km via National Highway 1

Key Highlights

Tram Vang Industrial Park is located in Thanh Phuoc Commune, Go Dau District, Tay Ninh Province (based on the administrative names before July 1, 2025). It has a total planned area of 479 ha, of which 375 ha is Industrial Land. According to the available information, the park sits right next to the Trans-Asia Highway, 14 km from the Moc Bai border gate, and targets low-pollution industries such as mechanical engineering, electronics, textiles and garments, footwear, and food processing.

This article covers the location, scale, infrastructure, industries, costs, and Tax Incentives so you can decide whether to lease land here.

Overview of Tram Vang Industrial Park

Tram Vang Industrial Park is in Thanh Phuoc Commune, Go Dau District, Tay Ninh Province, a province that shares a border with Cambodia. According to brokerage sources, land in the park is leased for a Land Use Period of 50 years.

The park is close to Long An and Binh Duong, two provinces with well-developed industrial ecosystems. Businesses therefore have convenient access to labor and to the supply chains of the Southern region.

Scale of Tram Vang Industrial Park

Tram Vang Industrial Park has a total planned area of 479 ha, including 375 ha of Industrial Land. According to the introductory materials, the land plots are designed flexibly to suit many types of factories.

Specification Details
Location Thanh Phuoc Commune, Go Dau District, Tay Ninh Province
Total planned area 479 ha
Industrial Land 375 ha
Land Use Period 50 years
Legal status Contact RSQUARE for detailed information

Infrastructure

Transportation system

The park has a 40 m wide main road (4 lanes) and 22 m wide branch roads (2 lanes), all surfaced with asphalt concrete. It lies right next to the Trans-Asia Highway and connects to National Highway 22, which leads to Ho Chi Minh City and the Moc Bai border gate.

Electricity system

Businesses in Tram Vang Industrial Park receive power at 22 kV, supplied from a 110/35/22 kV substation. The high-voltage network runs along the park’s internal roads.

One brokerage source quotes electricity prices across three time bands:

Time band Electricity price (USD/kWh)
Peak 0.10
Normal 0.05
Off-peak 0.03

Water supply system

Tram Vang Industrial Park supplies clean water to businesses with a capacity of 7,000 m³/day. Each business’s water consumption is measured by its own meter.

Businesses with high water demand, such as textiles and garments, dyeing, or food processing, should confirm the available capacity before signing a land lease. Contact RSQUARE for detailed water prices.

Location and connectivity to key economic regions

Tram Vang Industrial Park lies on Tay Ninh’s Trans-Asia economic corridor, the route linking Ho Chi Minh City with the Moc Bai border gate and Cambodia. This location offers the following advantages:

  • It sits right next to the Trans-Asia Highway, connecting Ho Chi Minh City and the Moc Bai border gate.
  • It is 14 km from the Moc Bai border gate and 37 km from the Xa Mat border gate, according to brokerage sources. Moc Bai is the nearest border gate; Xa Mat is in the Tan Bien area and is considerably farther.
  • It is close to Long An and Binh Duong, two provinces with well-developed industrial ecosystems.
  • It connects to National Highway 22 and to the planned Ho Chi Minh City – Moc Bai expressway.

Distance from Tram Vang Industrial Park to Ho Chi Minh City, airports, seaports, and border gates

The park is about 59-68 km from Ho Chi Minh City by road and 14 km from the Moc Bai border gate.

Destination Distance
Ho Chi Minh City 59 km / 67 km / 68 km (depending on source)
Tan Son Nhat Airport 53 km / 57 km
Long Thanh Airport 95 km
Saigon Port 62 km
Cat Lai Port 71 km / 75 km
Hiep Phuoc Port 75 km
Moc Bai border gate 14 km
Xa Mat border gate 37 km
Tay Ninh City center 46 km

Industries attracted to the park

Tram Vang Industrial Park has the potential to attract industries aligned with Tay Ninh’s industrial strategy, which prioritizes clean, low-pollution industries. Suitable industry groups include:

  • Mechanical engineering, machinery manufacturing and assembly
  • Electrical and electronics, and electronic component manufacturing
  • Textiles, garments, and footwear
  • Food and agricultural product processing
  • Consumer goods manufacturing

Tax Incentives and investment policies

Businesses with eligible projects may be considered for Tax Incentives under current regulations when investing in Tram Vang Industrial Park. Locating a factory in an industrial park does not automatically entitle a business to incentives. The level of incentives depends on the industry, scale, location, and project documentation.

Each industry has different incentive conditions, so you should identify your project’s industry and capital scale early. Contact RSQUARE for detailed Tax Incentives information for your project.

Should you lease land in Tram Vang Industrial Park?

You should lease land in Tram Vang Industrial Park if your business needs a factory near Ho Chi Minh City, connectivity to the Moc Bai border gate, and belongs to a low-pollution industry group.

Best suited for

  • Businesses in mechanical engineering, electronic component assembly, consumer goods, textiles and garments, footwear, and food processing.
  • Businesses that need to reach the Cambodian market via the Moc Bai border gate (14 km). The Xa Mat border gate (37 km, in the Tan Bien area) is a supplementary option and is considerably farther than Moc Bai.
  • Businesses that want a factory about 59-68 km from Ho Chi Minh City (according to brokerage information), right next to the Trans-Asia route, with a 40 m wide main internal road.

Points to consider before signing

  • Obtain written confirmation of the park’s legal status: the establishment decision, the investor, the detailed zoning plan, land use rights, and the lease term of the plot.
  • Confirm the actual water supply and wastewater treatment capacity, operating status, and any additional costs. Cross-check against the legal records, the design documents, and the current condition on site.
  • Confirm that your project’s industry is on the list permitted in the park and meets environmental requirements.
  • Confirm Tax Incentives according to your industry, location, capital scale, and the specific conditions of your project. Do not assume that every business in an industrial park receives the same incentives.
  • Assess logistics costs to your destination port.

Investor support services at RSQUARE

RSQUARE provides a comprehensive consulting package for domestic and foreign investors in industrial parks nationwide, including:

  • Industrial real estate consulting
  • Site survey and on-site visit services before signing a contract
  • Referrals to legal service providers for business licenses and investment registration certificates
  • Support in negotiating and concluding land lease contracts
  • Support in connecting with law firms and banks

With hands-on experience working directly with industrial park management boards and foreign investors, RSQUARE accompanies businesses from the site survey through to completing legal procedures and handing over the land.

Make an Inquiry

How can we help? Our team will get back to you soon.

1
Step 1
2
Step 2

Please enter the following information

Please enter the following information