Hoa Khanh Industrial Park is the second industrial park in Da Nang, established in 1998 under Decision 343/QD-TTg and located along National Highway 1A in the Lien Chieu area. The park covers a total area of 395.72 ha, of which 298.25 ha is leasable industrial land, and it is 100% occupied. It attracts assembly-based mechanical engineering, electronics, garment manufacturing, agro-forestry-seafood processing, post-petrochemical products, and building materials. This article summarizes the park’s scale, infrastructure, location, industries, costs, and incentives so that businesses can assess its suitability before leasing land or a factory.
Overview of Hoa Khanh industrial park
Hoa Khanh Industrial Park is the largest of Da Nang’s 6 industrial parks, located along National Highway 1A in the Lien Chieu area, in the west of the city.
The park was established in 1998 under Decision 343/QD-TTg dated April 18, 1998 of the Prime Minister. The original infrastructure developer was the Quang Nam – Da Nang Construction and Housing Business Joint Venture Company. At present, Phase 1 infrastructure is operated by the Da Nang Industrial Zones Infrastructure Development and Exploitation Company (Daizico), and Phase 2 is operated by the Saigon – Da Nang Investment Joint Stock Company.
The park’s land use period runs until April 2048. The actual lease term for each business is determined by its lease contract and the land use right certificate of each plot.
According to a report by Phap Luat Newspaper, the city is planning to adjust the park’s master plan toward a modern eco-industrial park.
Industrial park scale
Hoa Khanh Industrial Park has a total area of 395.72 ha, of which 298.25 ha is leasable industrial land, and it is currently 100% occupied.
| Indicator |
Specification |
| Total area |
395.72 ha |
| Leasable industrial land |
298.25 ha |
| Phase 1 infrastructure |
162 ha (initial infrastructure investment of USD 25.632 million) |
| Phase 2 infrastructure |
111.5 ha (land allocated under Decision 1675/QD-UB, 2002) |
| Total infrastructure investment under the original master plan |
Approx. USD 49.96 million |
| Occupancy rate |
97% (June 2013); 100% according to figures in later years |
| Number of projects (June 2013) |
190 projects, including 47 FDI projects (approx. 24.7%) |
| Japanese investors (June 2013) |
23 companies, approx. half of all FDI projects |
The areas of the two infrastructure investment phases (162 ha and 111.5 ha) are the areas of infrastructure investment for each phase and are not added together to form the park’s total area. The number of projects and the FDI share are figures published in June 2013; businesses should request the latest figures from the Management Board of Industrial Zones.
Infrastructure
Hoa Khanh Industrial Park has an internal road system, power supply from the national grid (40 MVA / 22 kV), water supply with a capacity of 30,000 m³/day, and a centralized wastewater treatment plant of 5,000 m³/day. The park also offers ready-built factories of 2,500 m² each, up to 8 m in height, with a steel frame, concrete floor, and a fire protection system.
Transportation system
The main internal road has a 15 m carriageway with two lanes, serving freight transport. The park lies along National Highway 1A, so it connects directly to the national road network.
Electricity supply
The park draws power from the national grid with a 40 MVA supply at 22 kV, and has a backup power plant. Electricity prices follow the current tariff issued by the competent authority, depending on customer group and time of use.
Water supply
The park’s water supply system has a capacity of 30,000 m³/day. According to figures published in 2013 on the Da Nang portal, water supplied to the factories in the park at that time was 15,000 m³/day. Water prices follow the current tariff.
Wastewater treatment facility
The centralized wastewater treatment plant has been operating since 2007, with a design capacity of 5,000 m³/day and night, using a combined chemical-biological process. Treated wastewater meets column B of QCVN 40:2011/BTNMT. In 2013, actual wastewater volume was approximately 3,000-3,500 m³/day and night. Businesses that generate a large volume of wastewater should confirm the available capacity, acceptance standards, and unit price with the operator before signing a contract.
Location and connectivity to the key economic region
Hoa Khanh Industrial Park is about 10 km from Da Nang city center, Da Nang International Airport, and Da Nang Railway Station, and it takes about 20 minutes by car to reach the inner city.
- Located along National Highway 1A, the main North-South artery
- About 10 km from the city center
- About 10 km from Da Nang International Airport
- About 10 km from Da Nang Railway Station
- Part of the central urban area of the Central Key Economic Region
The distance to seaports depends on the transport route; import-export businesses should calculate logistics time and cost for their specific route.
Allowed industries
Hoa Khanh Industrial Park attracts small and medium-sized projects in 4 industry groups.
- Assembly-based mechanical engineering, electronics, and garments
- Post-petrochemical products such as packaging and plastics
- Agro-forestry-seafood processing
- High-grade building materials
The park already hosts long-established foreign companies, including 23 Japanese companies (2013 figures), forming a manufacturing ecosystem in which supporting-industry companies can find partners. The list of restricted or non-accepted industries is set by the infrastructure developer and the Management Board. Businesses that generate large volumes of wastewater or special waste should confirm industry eligibility before paying a deposit.
Tax incentives and investment policies
Tax incentives at Hoa Khanh Industrial Park apply by project and eligible industry; they do not automatically apply to every business leasing land in the park.
- Corporate income tax: High-tech enterprises and supporting-industry manufacturing projects on the priority list, with a confirmation of incentives, may enjoy a 10% tax rate for 15 years, with tax exemption for the first 4 years and a 50% reduction for the next 9 years. The start date of the exemption and reduction is determined under current regulations and each project’s incentive dossier.
- Import tax: Projects eligible for investment incentives may receive an import tax exemption on goods imported to form fixed assets, provided the goods are allocated and accounted for separately for the incentivized part of the project.
- Export processing enterprises: Subject to specific value-added tax and import-export tax policies for export manufacturing activities, with conditions on accounting, customs supervision, and procedures under regulations.
Businesses should cross-check with the tax authority and the Da Nang High-Tech Park and Industrial Zones Management Board when preparing project dossiers.
Occupancy status and alternatives around Hoa Khanh
Hoa Khanh Industrial Park is 100% occupied, so businesses that need land usually approach it through ready-built factories, sublease or transfer, or neighboring industrial parks.
- Leasing a ready-built factory: Suitable for businesses that need to start operating quickly and do not want to build themselves.
- Receiving a transfer of a land plot or factory: Requires checking the remaining land lease term, the land use right certificate, and the project dossier.
- Neighboring industrial parks, including Hoa Khanh Expansion: Actual available land must be verified before planning.
RSQUARE updates land, factory, and neighboring industrial park listings in Da Nang so that businesses can compare before choosing.
Should you lease land at Hoa Khanh Industrial Park?
Businesses in assembly-based mechanical engineering, electronics, garments, and processing should consider Hoa Khanh Industrial Park thanks to its location near Da Nang city center, the airport about 10 km away, and electricity, water, and wastewater infrastructure that has operated for many years.
Strengths:
- About 10 km from the city center, airport, and railway station of Da Nang.
- Centralized infrastructure, with a wastewater treatment plant operating since 2007.
- An established business ecosystem, including many Japanese investors.
- Ready-built factories, shortening the time to start production.
Points to consider:
- The park is 100% occupied, so available land and vacant factories are limited.
- The wastewater treatment plant has a design capacity of 5,000 m³/day and night; businesses with large discharge volumes need to confirm the remaining capacity.
- The remaining land lease term of each plot must be checked in the contract.
- Tax incentives depend on the industry and the conditions of each project.
Businesses that need a large area or a long lease term should also compare newer industrial parks around Da Nang.
RSQUARE investor support services
RSQUARE provides a comprehensive consulting package for domestic and foreign investors at industrial parks nationwide, including:
- Industrial real estate consulting
- Site survey and on-site visit services before contract signing
- Support in referring legal services for business licenses and investment certificates
- Support in negotiating and signing land lease contracts
- Support in connecting with law firms and banks
With experience working directly with industrial park management boards and foreign investors, RSQUARE accompanies businesses from site survey through completion of legal procedures and site handover.