March 2026 Vietnam Industrial Real Estate Guide

The Final Puzzle Piece of the Southern Core Expressway Route

Phuoc Khanh Bridge is a mega-bridge with the highest navigational clearance in Vietnam (55m) and serves as the most crucial connecting link on the southern core expressway axis.

Currently, the construction progress has reached over 95%. With the official opening scheduled for May 2026, the full operation of the entire route is just around the corner.

This project goes beyond mere transportation infrastructure. As a key artery directly connecting Long An industrial parks with international ports and Long Thanh International Airport, it is expected to be a turning point driving a new leap forward for Long An province as well as the entire Southern Key Economic Zone.

Upon the completion of the Phuoc Khanh Bridge and the opening of the entire expressway, the logistics travel time from industrial parks in Long An province to the Cai Mep – Thi Vai Port and Long Thanh International Airport is expected to be significantly reduced.

Businesses can expect to lower logistics costs and enhance operational efficiency by bypassing the chronic traffic congestion in downtown Ho Chi Minh City and on National Highways 1A and 51.

With the full opening of the Ben Luc – Long Thanh Expressway in 2026, Long An province will grow into a key hub for manufacturing and logistics infrastructure, equipped with an outstanding transportation network.

If you need detailed consultation regarding investment in Long An province or wish to inquire about the overall investment environment in Vietnam, please feel free to contact us at the details below at any time.

  • Contact: 0931-444-260
  • KakaoTalk: rsquarevn
  • Zalo: Rsquare Vietnam

Tuyet Lan

Published: 8/4/2026

Updated: 8/4/2026

Share to

Copy link